1st Bath: during ......... 1st Bath: after
Living Rm:during ........ Living Rm: after
Bar Area: during .......... Bar Area: after
2nd Bath: during ......... 2nd Bath: after
Laundry Area ........... Hall into Laundry.......... and Bedroom
All plumbing supplies and drains were relocated and replaced and new Porcher faucets and Kohler fixtures were installed.
The majority of the electric system was upgraded, new circuits added, new Leviton dimmers and Halo fixtures were installed. The new lighting design was done by aOi.
All HVAC ducts were replaced and supply registers and return grills were relocated to provide better air movement. The system was redesigned by aOi in collaboration with Gem Plumbing.
All wood floors were refinished and new porcelain tile floors were installed by aOi.